Hb Smith G200 Manual
Smith Cast Iron Boilers. Smith Cast Iron Boilers. Smith Cast Iron Boilers are known throughout North America for their rugged reliability. Our products range from.
FREE Standard Shipping on orders of $ or more Purchase requirement calculated before taxes and shipping charges and after other discounts have been applied and must be made in a single transaction. Cannot be applied to previous purchases and cannot be redeemed for cash. Valid for standard ground shipping within the continental United States and not valid for shipments to Alaska, Hawaii, Puerto Rico, Guam and the US Virgin Islands. Offer valid for online purchases only. In an event of a return, coupon savings may be deducted from your refund.
Discount will be automatically applied during check-out. Sears Holdings reserves the right to terminate or modify this offer at any time for failure to comply with its terms and/or due to any operational malfunction of the software, hardware or equipment required to process this offer. © 2013 Sears Brands, LLC. May not be used with any other coupon, associate discount, or during Family & Friends or Member events.
. Water Treatment.3 Shipment of Boiler.3 SECTION 2: BOILER INSTALLATION Step 1: Locating/Setting Boiler. At time of removal of existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while other. Provisions for combustion air must be in accordance with the National Fuel Gas Code ANSI Z223.1 - latest edition, as well as all applicable local codes. If the boiler is installed in an unconfined space, adequate air will be available via normal infiltration.
SECTION 2: BOILER INSTALLATION STEP 1: LOCATING/SETTING BOILER Boiler may be installed in an alcove (see dimensions in Fig- ure 2.1). Locate boiler so connecting flue pipe between draft hood and chimney is as short as possible. Observe the following minimum clearances to combustibles: 18'.
Supply outlet must run full size from the boiler to a header at least 24' above top of boiler. Condensate return piping should be connected to boiler through a 'Hartford Loop.' .
Install flue pipe over top of vent damper and secure to damper housing with sheet metal screws or pop rivets. Attach vent damper cable to cable clamp on boiler left panel and join the Molex connector (see Figures 2.4 & 2.4A). FIGURE 2.4: VENT DAMPER INSTALLATION. Install a full-sized sediment trap at the low point in gas line upstream of gas valve. Install a non-restrictive lubricated plug valve in the gas line close to the boiler. Install a ground joint union at the gas valve inlet to allow for servicing. Check local codes and utilities for any special requirements and proce- dures.
Rhp bearings technical handbook for environmental health. In operation the units have proven reliability in the most hostile applications.
4331 Example: Boiler Model GB200-4H is to be installed. The distance from the existing gas meter to the installation site is 30 ft.
What pipe size must be used? The local utility indicates the heating value of natural gas being supplied is 1000 Btu per cu.ft. For vent damper-equipped models, connect thermostat to blue leads (see Figures 2.4 & 2.4A). NOTE: If any of original wire supplied with boiler must be replaced, use similar wire of 105° C rating. Other- wise, insulation may melt or degrade, exposing bare wire.
Hb Smith G200 Boiler
FIGURE 2.10: Wiring Diagram & Operation Sequence for Boilers Equipped with Intermittent Pilot, Vent Damper and 400 Series or M & M PS804 LWCO FIGURE 2.11: Wiring Diagram & Operation Sequence for Boilers Equipped with Standing Pilot, Vent Damper and 400 Series or M &. This is a manu- al reset-type device and can be reactivated by depressing the spill switch reset button mounted on the left of the boiler’s draft diverter (see Figure 2.1 for switch location). The rollout switch prevents flame rollout from the boiler com. Start and stop burners several times by raising and low- ering the thermostat setting. After boiler has been firing long enough to raise boiler pressure above minimum setting of the primary pressure- tol limit, check limit by turning its setting from maximum to minimum setting. If you do not follow these instructions exactly, a fire or explosion may result with property damage, personal injury, or loss of life. BEFORE OPERATING smell all around the appliance area for gas.
Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. In addition, the boiler should be examined by a quali- fied service professional at least once every year. DANGER:To avoid fire and explosion hazards: Do not. Provide pipe connection (full size) from pressure relief valve opening to a convenient drain to serve as a vent. Fill the boiler with a manual fill valve until water starts to trickle from this pipe.
Fire boiler at sufficient rate to generate and maintain steam. GB200 Series REPLACEMENT PARTS LIST MODEL GB200 SERIES REPLACEMENT PARTS LIST NAME OF PART Jacket - Complete Jacket - Complete Jacket - Complete Burner - N.G./L.P. Burner w/Pilot Bracket - N.G./L.P. Base Door Ass'y Base Door Ass'y Base Door Ass'y. NAME OF PART Standing Pilot Pilot Ass'y NG- Q314ALB, Q309A Pilot Ass'y NG- Q314ALB, Q309A Pilot Ass'y LP- Q314ALB, Q309A Pilot Ass'y LP- Q314ALB, Q309D — Thermocouple K16RA-30D Thermocouple K16RA-36D Gas Valve - NG VR8200H-1129 NG/LP. Transformer 115/24 V, 43VA Honeywell Intermittent Pilot System Pilot Ass'y NG- Q3451B Pilot Ass'y NG- Q3451B.
FIGURE 1: GB200 GENERAL ASSEMBLY. Carbon monoxide (CO) is a gas which is odorless, colorless and tasteless but is very toxic. If your Smith boiler is not working properly, or is not vented properly, dangerous levels of CO may accumulate. CO is lighter than air and thus may travel throughout the building. Brief exposure to high concentrations of CO, or prolonged exposure to lesser amounts of CO, may result in carbon monoxide poisoning.